Hello Sushi TGA Xings
Food Outlet Fit-out
As one of the many fit-out contractors at the Crossings in Tauriko, Arrowsmith was tasked with completing their largest and most complex fit-out project to date. The project required the installation of a significant overhead structure before any of the ground level works could commence. The base build works were still in progress when Arrowsmith arrived, adding to the challenge of the short turnaround times and the deadline with no extension.
The team at Arrowsmith rose to the occasion, carefully planning and executing the project within the allocated timeframe and budget. The project required high attention to detail due to the complex design and high-quality fittings. Despite the challenges, Arrowsmith delivered the project on time and within budget, meeting the client's expectations.
Arrowsmith's expertise in fit-out projects allowed them to overcome the challenges presented by the ongoing base build works and deliver a high-quality outcome. The success of this project further strengthened Arrowsmith's reputation in the industry, positioning them as a reliable and capable fit-out contractor.